Sign In | Join Free | My xpshou.com |
|
Brand Name : KEL
Model Number : KEL-AST
Certification : CE
Place of Origin : CHINA
MOQ : 1 set
Price : negotiation
Supply Ability : 300 set/ month
Delivery Time : 8-15 working day
Packaging Details : plywood packing
size : customized
lock : automatic induction system lock
material : stainless steel
name : clean room air shower
original : China
warranty : 1 year
Automatic Induction System Stainless Steel Customized Type Cleanroom Air Shower
Introduction
With the development of science and technology, air purification technology is not only widely used in the research and production departments of precision instruments, precision machinery and electronic products, but also applied to metallurgy, chemical industry, light industry, biology, pharmaceutical, pure water, medical and food. Technical field.
The air shower room is an important supporting equipment for the ultra-clean studio and factory building. It is used for the air shower before the workers enter the purification work to remove the dust on the surface of the person and the carrying items. At the same time, it also acts as an air lock to prevent the air. Purified air enters the purification zone. To ensure the cleanliness of the purification environment.
KEL series double-sided electronic chain air shower is a kind of purification equipment for creating clean air environment. Its use guarantees high precision, high purity and high reliability, and has good effect on improving product yield.
Main Features
1. This equipment adopts stainless steel structure. In order to facilitate transportation, installation and maintenance, special assembly type is adopted.
2. The equipment is assembled from top cover, box, chassis, access door, pre-filter, high efficiency filter, motor fan unit and nozzle flap, electrical control and other components. It has the characteristics of compact structure, sturdy and durable, beautiful appearance and so on.
3. Install the box on the chassis first, then install the top cover, connect all the electrical plugs, attach the nozzle to the active board, then fix the door frame with screws, and finally install the decorative parts.
4. Latex sponge should be placed at the joint between the equipment and the ultra-clean studio or purification plant to ensure sealing and prevent the external airflow from affecting the cleanliness of the ultra-clean studio or purification plant.
5. The power supply of this equipment should be connected to the power supply of the ultra-clean working area so that it can be powered off even when the clean working area is powered off.
![]() |
Automatic Induction 30m/Sec Cleanroom Air Shower Stainless Steel Images |